Key takeaways
- An on-only reading includes IR drop, so it can make a pipeline look better protected than it is.
- Interrupted surveys switch current sources off for a split second to read the instant-off potential.
- Native and depolarized surveys give the baseline you need for the 100 mV polarization criterion.
A close interval survey walks the pipeline and records the pipe-to-soil potential every few feet, instead of only at test stations a mile apart. The result is a continuous profile that shows where cathodic protection is doing its job and where it is not. But "CIS" is not one test. The type of survey you order decides what the numbers can tell you.
Why the survey type matters: IR drop
When protective current flows through the soil, it creates a voltage drop between the pipe and the reference electrode on the surface. That drop, called IR drop, gets added to the reading. On a well-coated pipe in high-resistance soil it can be large enough to make an underprotected section look fine.
The common NACE/AMPP criteria (for example -850 mV versus a copper/copper sulfate electrode, or 100 mV of polarization) expect you to account for IR drop. Most of the survey types below exist to do exactly that.
The five survey types
| Survey | Current sources | What it tells you |
|---|---|---|
| On-only | Left on | Quick screening profile. Includes IR drop, so treat it as a trend, not proof of protection. |
| Interrupted (on/off) | Switched on and off on a synchronized cycle | The instant-off potential, close to the true polarized potential, alongside the on reading. |
| Depolarized | Off long enough for the pipe to depolarize | The starting point to calculate polarization shift for the 100 mV criterion. |
| Native | Never energized (before CP) | The true baseline of a new or unprotected line. |
| Pipeline current mapping | On | Where current is leaving or entering the line, pointing to coating damage or contacts. |
How an interrupted survey works
Every rectifier and bond that influences the section gets a current interrupter. The interrupters are synchronized, usually by GPS, to switch off for a short part of each cycle. The surveyor records both the on and the instant-off potential at each reading. Read the off value too late and the pipe has started to depolarize; read it too early and you catch switching spikes. Good equipment and an experienced crew matter here.
Adding DC cell-to-cell and coating surveys
Two reference cells read side by side show the direction of current flow in the soil. That makes DC cell-to-cell testing useful for finding hot spots, side drains and interference that a single-cell survey can miss. When the question is the coating rather than the CP level, DCVG and ACVG surveys locate individual coating holidays so a dig can be planned exactly where it is needed.
What good survey data looks like
- Every reading tied to a sub-meter GPS position, so it lines up with ILI data and your GIS.
- On and off profiles plotted against criteria, with test stations, crossings and rectifiers marked.
- Anomalies flagged and ranked, with a recommendation for each one.
- Data you can import, not just a PDF: delivered through a secure client server or standard file formats.
That is how RCS delivers every survey: sub-meter GPS on all data, reports and maps in the format you need, and secure delivery through the RCS client server.
Related service